Tag Archives: Madhya Pradesh

A2Z WILL PREVENT LOSS OF 6 PERCENT REVENUE

14 Jul

Madhya Pradesh

2300 Meters installed and review is under progress

  • The first Indian electricity company;
  • Bagged contract for Hundreds of Crore rupees;
  • Monitoring through Computer Lab;
  • No possibility of tampering with meters;
  • Doing away with botheration of taking monthly reading of meters.

With the aim of tightening the noose over the big power consumers through remote metering, Shri Pankaj Agrawal, then CMD of Eastern region Power Distributing Company assigned two plans coded as D -14 and D-12 to the A2Z Company which had claimed that it would increase the revenue earning of the distributing company to the tune of crores of rupees by checking electricity loss up to 6 percent in 19 circles under Jabalpur, Sagar, Reeva regions, due to which the company bagged the contract of hundreds of Crore rupees.

As per the terms of the tender, the distributing company will provide 15 percent amount in advance to A2Z Company for setting up plant and procuring material and the company will be given an amount of approximately Rs 55 Crore for D-12 and Rs 20 Crore for D-14. The Project Manger, Shri Rohit  Noshahri, informed ‘The Look’ that the company will install ‘Air controller Electronic Meter’ in the establishments of  heavy power consuming customers and the meter will be directly connected with the computer control lab of A2Z company. The A2Z lab will monitor the operations of customers’ meters and report the officers of the concerned district in the cases of minor tampering of the meters. At present, 2300 meters have been installed in the industry establishments in Jabalpur region, out of which 150 in Jabalpur city Mandla, 325 in Damoh, Satna 600 and 150 in Jabalpur rural areas. Before installing these meters, minor technical system including service line of consumer premise was strengthened.

According to Project Manager, Shri Rohit, Eastern region power distributing company will monitor the electricity bills of those consumers who are placed under review for 1-2 months. Though the consumers may get agitated with this activity yet power distributing company has awarded the contract to private companies after testifying their infrastructure in order to prevent revenue and transmission losses. Shri Rohit told that where the revenue loss is 60 percent in the feeders under D-12, the engineers of A2Z company are conducting survey there. The service line, construction etc items will be demarked and will be entered as an input for the software and the computer system will identify the problem, whenever it occurs.

The Project Manager also informed ‘The Look’ that A2Z Company will get rid of the botheration of recording the meter reading every month by the Distributing Company.  As the meters will be directly connected with the computer lab of the company, therefore, A2Z Company will automatically record the readings while sitting in their offices and recording will be completed within a week like telecommunication and mobile network companies.

A2Z Company is working in Jammu and Kashmir and Laddakh area. The Project Manager informed that A2Z Company which is worth of Rs 1000 Crore, has obtained order from Haryana Electricity Board also for reviewing  cases after installing 30 meters currently. In India they have emerged as the first company in the power sector which claims to have reduced the distribution and transmission losses of electricity.  A2Z Company is installing the meters after testing them in a testing centre established in Gujarat and through a testing lab of Eastern region power distributing company. Meters are installed outside the premises of the establishments. Shri Rohit while informing ‘The Look’, said that A2Z is endeavoring itself to lay the meter armed cable. The distributing company will procure the same on the requirement of the company and A2Z Company will get the payment only after the clearance certificates are received from the Field Officers.

A2Z is reviewing in the following areas

Jabalpur East               Panda ki Madhiya                   Bhooteshwar – 2

Ghamapur                   Jabalpur South                                    Kakaganj

Dwarkanagar               Tilwara                                    Shastrichowk

Footatal                       Kalimath                                 Gopalganj

Omati                          Bajriya                                     Katra

Hanumantal                 Pipriya                                     Civil Line

Premsagar                    Thakurgram                             Satna City

Pasiyana                      Amkhera                                 South

Bahorgagh                   Jabalpur North                                    Najeerabad

Chandni Chowk          Adhartal – T                            North

Sadar                           Ranjhi Bazar                           Tikuriya Tola

Hathital                       Bajrang Nagar                        City – 1

Gorakhpur                   Sagar city                                City – 2

Jabalpur West              City 1                                      Emergency

Okhari – 4                    Sadar                                       Krishna Nagar

Right Town                 Dharamshri                              Bagha

Look Hindi Monthly – August 2009 Page No. 24

Jabalpur on top in recovery of arrears worth Rs 16 Crore

14 Jul

Madhya Pradesh                                                                                                       The Look

  • Eastern Region Power Distributing Company, Jabalpur Division;
  • Division’s significant success in revenue collection.

The Superintendent Engineer of Jabalpur city Division, Shri Ajay Pandey informed ‘The Look’ that there is a decrease in the arrears to the tune of Rs 16 Crore from December 2007 to March 2009. At the time of his resuming office, it was informed that that the amount of arrears was Rs 37 Crore. Within a short period of one year of his taking charge, the arrears are estimated at 33 percent. In other words, the company increased the revenue of the company by recovery of Rs one Crore per month from the arrears. The erstwhile officers had piled up the amount of arrears in the city Division, which is still a burden upon the company. The City Division has set a better record by recovery of 104 percent revenue from April 08 to March 09. The City Division is on the top in recovery of arrears at company level. The Look Bureau has found on verification that in many circles the arrears upto Rs 10 Crore has been waived off. Several Officers have been served Show Cause Notices in connection with the arrears recovery and the Superintendent Engineer of the City Division, Shri Ajay Pandey thanks his subordinate staff for extending co-operation and said that the work of daily reviewing of the cases for recovery was done under his supervision and his first priority is to curtail line losses of the city. The Executive Engineer was empowered with the rights of taking legal actions in this regard.

  • A2Z Company has been given a contract to prevent electricity loss in 25 feeders
  • 5 new call center
  • Recovery of Rs. 24.26 Crore in one year

He gives credit to the cooperation and suggestions given by the four Executive Engineers of the city. Shri Pandey admits the possibility of power theft in several power loss areas of Jabalpur city. He says that the power loss will be reduced after power Thanas are established. However, A2Z Company has been awarded the contract of preventing power loss in 25 feeders. The said company will monitor the consumers in different phases in order to prevent power losses. Next course of action in other feeders will be determined after the success in these 25 feeders. The Superintendent Engineer, Shri Pandey told that the power cut should not be made repeatedly but the instructions from Company’s CMD and the department of Energy have been received with regards to tightening the noose round the consumers involved in power theft. The common consumers should avoid the unnecessary consumption of the electricity and should use electricity in domestic use with caution. Shri Pandey emphasized that the number of domestic consumers are more than the industrial consumers in the city. The work of recovery and preventing the loss is particularly very tedious and needs use of power due to the Muslim dominated areas in the city. The erstwhile Division has endeavored to prevent the loss at the rate of 5 percent per year. The erstwhile Division was on the top by making recovery of Rs 331 L in July, Rs 339 L in August, Rs 320 L in October, Rs 308 L in November, Rs 257 L in September, Rs 274 L in January, Rs 249 L in Feb and Rs 258 L in March. Shri Pandey said that the Western Division has made the recovery of 104 percent to the tune of Rs 6721.73 L from April 08 to March 09, South Division made the recovery of 103 percent to the tune of Rs 4324.77 L, North Division made the recovery of 102.01 percent to the tune of Rs 3221.68 L during the given period and thus maintained top position for Jabalpur City Division in making recovery.

Year East Division West Division North Division South Division
April 07 to March 08 3139.82 L 99.34% 6077.64 L 100.23% 3838.62 L 99.94% 2868.43 L 99.77%
April 08 to March 09 3515.32 L 106.81% 6721.64 L 104.34% 4324.77 L 103.70% 3231.68 L 102.01%

The Look Hindi Monthly – July, 2009 Page No.36